A note on ``Two-machine flow-shop scheduling with rejection'' and its link with flow-shop scheduling and common due date assignment (Q339677): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2012.04.009 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1965492827 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling shops to minimize the weighted number of late jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4821818 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine flow-shop scheduling with rejection / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two due date assignment problems in scheduling a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3378953 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Enumeration of Pareto Optima for a Flowshop Scheduling Problem with Two Criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling under the job rejection constraint / rank
 
Normal rank

Latest revision as of 22:06, 12 July 2024

scientific article
Language Label Description Also known as
English
A note on ``Two-machine flow-shop scheduling with rejection'' and its link with flow-shop scheduling and common due date assignment
scientific article

    Statements

    A note on ``Two-machine flow-shop scheduling with rejection'' and its link with flow-shop scheduling and common due date assignment (English)
    0 references
    0 references
    0 references
    11 November 2016
    0 references
    two-machine flow-shop
    0 references
    scheduling with rejection
    0 references
    common due date assignment
    0 references

    Identifiers