Parallel machine scheduling with nested processing set restrictions and job delivery times (Q1792963): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1155/2016/3203728 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2519331049 / rank
 
Normal rank
Property / cites work
 
Property / cites work: PERFORMANCE ANALYSIS OF SIX APPROXIMATION ALGORITHMS FOR THE ONE-MACHINE MAXIMUM LATENESS SCHEDULING PROBLEM WITH READY TIMES / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4217266 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for parallel machine scheduling with delivery times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Jackson's Rule for Single-Machine Scheduling: Making a Good Heuristic Better / rank
 
Normal rank
Property / cites work
 
Property / cites work: Efficient approximation schemes for scheduling problems with release dates and delivery times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling with job assignment restrictions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling with nested processing set restrictions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fast approximation algorithms for job scheduling with processing set restrictions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling with nested job assignment restrictions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bounds for Certain Multiprocessing Anomalies / rank
 
Normal rank

Latest revision as of 20:30, 16 July 2024

scientific article
Language Label Description Also known as
English
Parallel machine scheduling with nested processing set restrictions and job delivery times
scientific article

    Statements

    Parallel machine scheduling with nested processing set restrictions and job delivery times (English)
    0 references
    0 references
    12 October 2018
    0 references
    Summary: The problem of scheduling jobs with delivery times on parallel machines is studied, where each job can only be processed on a specific subset of the machines called its processing set. Two distinct processing sets are either nested or disjoint; that is, they do not partially overlap. All jobs are available for processing at time 0. The goal is to minimize the time by which all jobs are delivered, which is equivalent to minimizing the maximum lateness from the optimization viewpoint. A list scheduling approach is analyzed and its approximation ratio of 2 is established. In addition, a polynomial time approximation scheme is derived.
    0 references

    Identifiers