Mathematical analysis and an exact solution combined with preprocessing method for resynchronizing of bus timetable problem (Q1721431): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 4 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1155/2018/7832638 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2889932288 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3523238 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Strategic timetable scheduling for last trains in urban railway transit networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simulated annealing algorithm for first train transfer problem in urban railway networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Timetable coordination of first trains in urban railway network: a case study of Beijing / rank
 
Normal rank

Latest revision as of 03:21, 18 July 2024

scientific article
Language Label Description Also known as
English
Mathematical analysis and an exact solution combined with preprocessing method for resynchronizing of bus timetable problem
scientific article

    Statements

    Mathematical analysis and an exact solution combined with preprocessing method for resynchronizing of bus timetable problem (English)
    0 references
    0 references
    0 references
    0 references
    8 February 2019
    0 references
    Summary: Bus timetabling is a subproblem of bus network planning, and it determines departure time of each trip of lines to make vehicles from different lines synchronously arrive at transfer stations. Due to the well-designed coordination of bus timetables, passengers can make a smooth transfer without waiting a long time for connecting buses. This paper addresses the planning level of resynchronizing of bus timetable problem allowing modifications to initial timetable. Timetable modifications consist of shifts in the departure times and headways. A single-objective mixed-integer programming model is proposed for this problem to maximize the number of total transferring passengers benefiting from smooth transfers. We analyze the mathematical properties of this model, and then a preprocessing method is designed to reduce the solution space of the proposed model. The numerical results show that the reduced model is effectively solved by branch and bound algorithm, and the preprocessing method has the potential to be applied for large-scale bus networks.
    0 references

    Identifiers