Two-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectives (Q1730482): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Scheduling Problems with Two Competing Agents / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-agent single machine scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Lagrangian approach to single-machine scheduling problems with two competing agents / rank
 
Normal rank
Property / cites work
 
Property / cites work: A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of scheduling problems with setup times or costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multiple-criterion model for machine scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with two competing agents, arbitrary release dates and unit processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-agent scheduling on uniform parallel machines with min-max criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling problems with two competing agents to minimized weighted earliness-tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time / rank
 
Normal rank
Property / cites work
 
Property / cites work: A two-machine flowshop problem with two agents / rank
 
Normal rank
Property / cites work
 
Property / cites work: Competitive Two-Agent Scheduling and Its Applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving a two-agent single-machine scheduling problem considering learning effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: Unbounded parallel-batching scheduling with two competitive agents / rank
 
Normal rank
Property / cites work
 
Property / cites work: A discrete version of particle swarm optimization for flowshop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling problems with two competing agents to minimize minmax and minsum earliness measures / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine batch scheduling with two competing agents to minimize total flowtime / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling two agents with controllable processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A two-agent single-machine scheduling problem with late work criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: An investigation on a two-agent single-machine scheduling problem with unequal release dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: <i>CON</i>/<i>SLK</i> due date assignment and scheduling on a single machine with two agents / rank
 
Normal rank

Latest revision as of 14:14, 18 July 2024

scientific article
Language Label Description Also known as
English
Two-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectives
scientific article

    Statements

    Two-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectives (English)
    0 references
    0 references
    0 references
    0 references
    6 March 2019
    0 references
    scheduling
    0 references
    competing agents
    0 references
    heuristic
    0 references
    combinatorial optimization
    0 references
    particle swarm optimization
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references