Two-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectives
DOI10.1007/S10479-017-2515-2zbMATH Open1410.90093OpenAlexW2612217147MaRDI QIDQ1730482FDOQ1730482
Authors: Shesh Narayan Sahu, Yuvraj Gajpal, Swapan Debbarma
Publication date: 6 March 2019
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-017-2515-2
Recommendations
- Two-agent singe-machine scheduling with release times to minimize the total weighted completion time
- scientific article; zbMATH DE number 6531341
- Two-agent scheduling problems on a single-machine to minimize the total weighted late work
- Two-agent single machine scheduling problem with the total weighted early work
- Competitive two-agent scheduling problems to minimize the weighted combination of makespans in a two-machine open shop
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27) Applications of game theory (91A80)
Cites Work
- A multiple-criterion model for machine scheduling
- A survey of scheduling problems with setup times or costs
- Multi-agent single machine scheduling
- Single machine scheduling with two competing agents, arbitrary release dates and unit processing times
- Competitive two-agent scheduling and its applications
- Scheduling Problems with Two Competing Agents
- Single machine batch scheduling with two competing agents to minimize total flowtime
- Two-agent scheduling on uniform parallel machines with min-max criteria
- A Lagrangian approach to single-machine scheduling problems with two competing agents
- Unbounded parallel-batching scheduling with two competitive agents
- A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
- Scheduling problems with two competing agents to minimize minmax and minsum earliness measures
- A two-machine flowshop problem with two agents
- Scheduling two agents with controllable processing times
- Solving a two-agent single-machine scheduling problem considering learning effect
- Scheduling problems with two competing agents to minimized weighted earliness-tardiness
- An investigation on a two-agent single-machine scheduling problem with unequal release dates
- Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties
- A discrete version of particle swarm optimization for flowshop scheduling problems
- Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time
- Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times
- \(CON/SLK\) due date assignment and scheduling on a single machine with two agents
- A two-agent single-machine scheduling problem with late work criteria
- A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing
Cited In (1)
This page was built for publication: Two-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectives
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1730482)