Scenario analysis-based decision and coordination in supply chain management with production and transportation scheduling (Q2310974): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
(4 intermediate revisions by 4 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: Lotus 1-2-3 / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.3390/sym11020160 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2913986868 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stochastic Transportation-Inventory Network Design Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Allocation and Distribution Model for Perishable Products / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Production and Outbound Distribution Scheduling: Review and Extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Scheduling of Production and Distribution Operations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost / rank
 
Normal rank
Property / cites work
 
Property / cites work: On solving multi-type railway line planning problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Evaluation of a third-party logistics (3PL) provider using a rough SWARA-WASPAS model based on a new rough dombi aggregator / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production and transport logistics scheduling with two transport mode choices / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated scheduling of production and distribution with release dates and capacitated deliveries / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrating multi-product production and distribution in newspaper logistics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with job delivery coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with transportation considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity of flow shop scheduling problems with transportation constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with release dates and job delivery to minimize the makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: The coordination of transportation and batching scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Finding optimal tour schedules on transportation paths under extended time window constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production and distribution scheduling with a perishable product / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with an availability constraint and job delivery coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the machine scheduling problem with job delivery coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated model for production and distribution planning of perishable products with inventory and routing considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Synchronizing production and air transportation scheduling using mathematical programming models / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stochastic versus deterministic approach to coordinated supply chain scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production and logistics planning: contract manufacturing and choice of air/surface transportation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving a manpower scheduling problem for airline catering using metaheuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Location-routing: issues, models and methods / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Revision as of 20:42, 19 July 2024

scientific article
Language Label Description Also known as
English
Scenario analysis-based decision and coordination in supply chain management with production and transportation scheduling
scientific article

    Statements

    Scenario analysis-based decision and coordination in supply chain management with production and transportation scheduling (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    10 July 2019
    0 references
    Summary: The production and rail transportation coordinating problem aims to determine a pre-operational timetable for a set of orders. The orders need to be manufactured on a dedicated production line and be delivered to their destination by the pre-planned trains considering traveling routes and time. The connecting trains are an important and even unique chance for orders to reach their final destinations, and earliness and tardiness penalties in the connection and delivery process are closely related to the symmetry and harmony between production procedure decision and train-allocated choice. A scenario analysis method is adopted to reveal the relationships between production collection connecting time (PCCT) and production collection waiting time (PCWT) in the production process. In the delivery process, the relationships between production delivery connecting time (PDCT) and production delivery waiting time (PDWT) are mainly considered. An integrated scheduling coordination model is established to maximize the production connecting time (PCT) and production delivery time (PDT). The GA genetic algorithm is employed to solve this problem. The numerical results show that the coordinated schedule in our method can significantly reduce the number of missed connections when compared with considering delivery timeliness only through a delivery time window. Additionally, it is revealed that the quantitative performances of the delivery timeliness improved by the connecting quality (PCT) are much better than those from the view of the delivery time window (PDT).
    0 references
    0 references
    0 references
    0 references
    0 references
    scheduling
    0 references
    timetable coordination
    0 references
    production
    0 references
    rail transportation
    0 references
    connecting time
    0 references
    waiting time
    0 references
    0 references