Multimode resource-constrained project scheduling in flexible projects (Q2301187): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10898-019-00832-8 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2978197491 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project management with time, cost, and quality considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling: Notation, classification, models, and methods / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the expected makespan of a project with stochastic activity durations under resource constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: The discrete time-cost tradeoff problem revisited / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal procedures for the discrete time/cost trade-off problem in project networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4166568 / rank
 
Normal rank
Property / cites work
 
Property / cites work: PSPLIB -- a project scheduling problem library / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Faster Strongly Polynomial Minimum Cost Flow Algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: A characterization of heaps and its applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the discrete time, cost and quality trade-off problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances / rank
 
Normal rank
Property / cites work
 
Property / cites work: New computational results for the discrete time/cost trade-off problem with time-switch constraints / rank
 
Normal rank

Latest revision as of 00:21, 22 July 2024

scientific article
Language Label Description Also known as
English
Multimode resource-constrained project scheduling in flexible projects
scientific article

    Statements

    Multimode resource-constrained project scheduling in flexible projects (English)
    0 references
    0 references
    0 references
    28 February 2020
    0 references
    0 references
    multimode resource-constrained project scheduling problem
    0 references
    flexible project management approaches
    0 references
    matrix-based project planning
    0 references
    0 references