The complexity analysis and control of time-delay OEM supply chain considering R\&D efforts and marketing level (Q2209653): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Supplier managed inventory in the OEM supply chain: The impact of relationship types on total costs and cost distribution / rank
 
Normal rank
Property / cites work
 
Property / cites work: Collaborative R\&D and pricing policy of supply chain under the selection behavior of heterogeneous customer / rank
 
Normal rank
Property / cites work
 
Property / cites work: Pricing, manufacturing and inventory policies for raw material in a three-level supply chain / rank
 
Normal rank
Property / cites work
 
Property / cites work: Pricing decisions in marketing channels in the presence of optional contingent products / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamics and chaos control of a duopolistic Bertrand competitions under environmental taxes / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new supply chain model and its synchronization behaviour / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resilient extended dissipative control for Markovian jump systems with partially known transition probabilities under actuator saturation / rank
 
Normal rank
Property / cites work
 
Property / cites work: The complexity analysis in dual-channel supply chain based on fairness concern and different business objectives / rank
 
Normal rank

Latest revision as of 00:16, 24 July 2024

scientific article
Language Label Description Also known as
English
The complexity analysis and control of time-delay OEM supply chain considering R\&D efforts and marketing level
scientific article

    Statements

    The complexity analysis and control of time-delay OEM supply chain considering R\&D efforts and marketing level (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    4 November 2020
    0 references
    Summary: In this paper, we investigate a supply chain consisting of an OEM (i.e., original equipment manufacturer) and a CM (contract manufacturer), in which the OEM decides design effort level and marketing level, and the CM makes decision on product manufacturing effort level. We establish a three-dimensional discrete dynamic model with time delay. Firstly, the sufficient conditions for Neimark-Sacker bifurcation are obtained by using different combinations of decision delay periods as bifurcation parameters, and the effect of the adjustment speeds of decision variables on the system stability and impact of time delay on the system stability are discussed, respectively. Secondly, we perform numerical simulation of this model from the perspective of entropy theory. Finally, we propose two methods to control chaos. Results show that when the time delay or the adjustment speed of decision variable exceed a certain threshold, the system will be led into a chaotic state and the entropy of the system will increase. For alleviating the negative effects of chaotic systems, we introduce control parameters to make efficient control on the chaos. At the critical point, the critical value of the adjustment speed of design effort level (or marketing level) of OEM increases as the adjustment speed of the manufacturing effort level of CM decreases, and vice versa.
    0 references
    0 references
    0 references