Stockpile scheduling with geometry constraints in dry bulk terminals (Q2668656): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(5 intermediate revisions by 4 users not shown)
Property / author
 
Property / author: Robert L. Burdett / rank
Normal rank
 
Property / author
 
Property / author: Robert L. Burdett / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2021.105224 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W3120569877 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A sequencing approach for creating new train timetables / rank
 
Normal rank
Property / cites work
 
Property / cites work: A disjunctive graph model and framework for constructing new train schedules / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated approach for earthwork allocation, sequencing and routing / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated approach for scheduling health care activities in a hospital / rank
 
Normal rank
Property / cites work
 
Property / cites work: A flexible job shop scheduling approach with operators for coal export terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: A flexible job shop scheduling approach with operators for coal export terminals -- a mature approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling with additional resources: notation, classification, models and solution methods / rank
 
Normal rank
Property / cites work
 
Property / cites work: The benefit of preemption with respect to the \(\ell_p\) norm / rank
 
Normal rank
Property / cites work
 
Property / cites work: Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: An exact solution approach for scheduling cooperative gantry cranes / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch and price algorithm to solve the integrated production planning and scheduling in bulk ports / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 06:08, 28 July 2024

scientific article
Language Label Description Also known as
English
Stockpile scheduling with geometry constraints in dry bulk terminals
scientific article

    Statements

    Stockpile scheduling with geometry constraints in dry bulk terminals (English)
    0 references
    0 references
    0 references
    0 references
    7 March 2022
    0 references
    bulk terminal
    0 references
    stockpile geometry
    0 references
    heterogeneous blocks
    0 references
    meta-heuristics
    0 references

    Identifiers