Stockpile scheduling with geometry constraints in dry bulk terminals
From MaRDI portal
Publication:2668656
Recommendations
- Scheduling reclaimers serving a stock pad at a coal terminal
- Scheduling reclaimer operations in the stockyard to minimize makespan
- Linear models for stockpiling in open-pit mine production scheduling problems
- A reclaimer scheduling problem arising in coal stockyard management
- Obstructive block stockyard scheduling and optimization based on heuristic rules
Cites work
- A branch and price algorithm to solve the integrated production planning and scheduling in bulk ports
- A disjunctive graph model and framework for constructing new train schedules
- A flexible job shop scheduling approach with operators for coal export terminals
- A flexible job shop scheduling approach with operators for coal export terminals -- a mature approach
- A sequencing approach for creating new train timetables
- An exact solution approach for scheduling cooperative gantry cranes
- An integrated approach for earthwork allocation, sequencing and routing
- An integrated approach for scheduling health care activities in a hospital
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods
- Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs
- The benefit of preemption with respect to the \(\ell_p\) norm
Cited in
(4)- A reclaimer scheduling problem arising in coal stockyard management
- Exact and metaheuristic approaches to solve the integrated production scheduling, berth allocation and storage yard allocation problem
- Scheduling reclaimers serving a stock pad at a coal terminal
- Scheduling reclaimer operations in the stockyard to minimize makespan
This page was built for publication: Stockpile scheduling with geometry constraints in dry bulk terminals
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2668656)