A discrete time deteriorating inventory system with geometric lead time (Q2627453): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Set OpenAlex properties.
 
(4 intermediate revisions by 3 users not shown)
Property / author
 
Property / author: Balasubramanian Sivakumar / rank
Normal rank
 
Property / author
 
Property / author: Balasubramanian Sivakumar / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1504/ijor.2013.057513 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2153943383 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 10:17, 30 July 2024

scientific article
Language Label Description Also known as
English
A discrete time deteriorating inventory system with geometric lead time
scientific article

    Statements

    A discrete time deteriorating inventory system with geometric lead time (English)
    0 references
    0 references
    0 references
    31 May 2017
    0 references
    Summary: A discrete time (s, S) inventory system with demands occurring according to a Bernoulli process and geometrically distributed lead time is considered in this work. We address the situation in which the perishable items are packaged and stored in a suitable and controlled environment so that items in the packets do not perish over time. However, when a packet is opened to meet a unit demand, we assume that all the remaining items of that packet, which are brought out of controlled environment, may start decaying. As (s, S) type ordering policy is adopted for the packets. The distribution of the inventory level is obtained in the steady state. The system performance measures are derived and the results are illustrated numerically.
    0 references
    0 references
    discrete time inventory systems
    0 references
    perishable items
    0 references
    positive lead times
    0 references
    Bernoulli demand
    0 references
    inventory modelling
    0 references
    0 references