Tactical Production and Lot Size Planning with Lifetime Constraints: A Comparison of Model Formulations (Q4595321): Difference between revisions

From MaRDI portal
Changed an Item
Set OpenAlex properties.
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: LP-based heuristics for the capacitated lot-sizing problem: The interaction of model formulation and solution algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: Strong Formulations for Multi-Item Capacitated Lot Sizing / rank
 
Normal rank
Property / cites work
 
Property / cites work: bc — prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: Computational Complexity of the Capacitated Lot Size Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Manufacturing systems with random breakdowns and deteriorating items / rank
 
Normal rank
Property / cites work
 
Property / cites work: A probabilistic scheduling period inventory model for deteriorating items with lead time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Period Decompositions for the Capacitated Lot Sizing Problem with Setup Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition / rank
 
Normal rank
Property / cites work
 
Property / cites work: Deterministic Production Planning: Algorithms and Complexity / rank
 
Normal rank
Property / cites work
 
Property / cites work: The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Capacitated lot-sizing with sequence dependent setup costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Economic Lot Size Model with Perishable Inventory / rank
 
Normal rank
Property / cites work
 
Property / cites work: Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous lotsizing and scheduling by combining local search with dual reoptimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrating deterioration and lifetime constraints in production and supply chain planning: a survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot-size models with backlogging: Strong reformulations and cutting planes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A linear description of the discrete lot-sizing and scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3378954 / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1142/s0217595917500191 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2733382332 / rank
 
Normal rank

Latest revision as of 09:42, 30 July 2024

scientific article; zbMATH DE number 6813789
Language Label Description Also known as
English
Tactical Production and Lot Size Planning with Lifetime Constraints: A Comparison of Model Formulations
scientific article; zbMATH DE number 6813789

    Statements

    Tactical Production and Lot Size Planning with Lifetime Constraints: A Comparison of Model Formulations (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    30 November 2017
    0 references
    tactical production planning
    0 references
    lot sizing
    0 references
    lifetime constraints
    0 references
    perishability
    0 references
    mathematical models
    0 references
    0 references

    Identifiers