Multi-objective dynamic fuzzy scheduling and its algorithm in product collaborative design considering emergency (Q2988474): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Set OpenAlex properties.
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simulation approach for evaluation and improvement of organisational planning in collaborative product development projects / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Statistical Mechanics of Complex Product Development: Empirical and Analytical Results / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling of design projects with uncertain number of iterations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Insertion techniques for static and dynamic resource-constrained project scheduling. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A constraint-based approach for the shift design personnel task scheduling problem with equity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling to minimize product design time using a genetic algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for large scale shift minimisation personnel task scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid genetic algorithm and simulated annealing approach for the optimization of process plans for prismatic parts / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy job-shop scheduling problems: a review / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for flexible job shop scheduling with fuzzy processing time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.3233/ifs-141491 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1860343168 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 10:12, 30 July 2024

scientific article
Language Label Description Also known as
English
Multi-objective dynamic fuzzy scheduling and its algorithm in product collaborative design considering emergency
scientific article

    Statements

    Multi-objective dynamic fuzzy scheduling and its algorithm in product collaborative design considering emergency (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    19 May 2017
    0 references
    product collaborative design scheduling problem
    0 references
    fuzziness
    0 references
    dynamic scheduling
    0 references
    emergency
    0 references
    multi-objective optimization
    0 references
    algorithm
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references