Insertion techniques for static and dynamic resource-constrained project scheduling. (Q1399570)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 1957036
Language Label Description Also known as
default for all languages
No label defined
    English
    Insertion techniques for static and dynamic resource-constrained project scheduling.
    scientific article; zbMATH DE number 1957036

      Statements

      Insertion techniques for static and dynamic resource-constrained project scheduling. (English)
      0 references
      0 references
      0 references
      0 references
      30 July 2003
      0 references
      In the paper the Resource-Constrained Project Scheduling Problem (RCPSP) minimizing the makespan in static and dynamic environments is considered. Based on a flow network model for feasible schedules a polynomial insertion algorithm is developed which inserts one activity into an existing schedule. This algorithm is used for robust rescheduling in a dynamic environment and as a subroutine in a tabu search procedure for the static RCPSP. Computational results are presented for the PSPLIB benchmark instances of \textit{R. Kolisch, A. Sprecher} and \textit{A. Drexl} [Manage. Sci. 41, 1693--1703 (1995; Zbl 0870.90070)] showing the potential of the proposed concept.
      0 references
      0 references
      resource-constrained project scheduling
      0 references
      tabu search
      0 references
      robust scheduling
      0 references
      flow network