Schedule-induced posets (Q1081529): Difference between revisions
From MaRDI portal
Added link to MaRDI item. |
Set OpenAlex properties. |
||
(2 intermediate revisions by 2 users not shown) | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Properties of almost all graphs and complexes / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q4658190 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q4166568 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Intransitive Indifference in Preference Theory: A Survey / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A Characterization of Comparability Graphs and of Interval Graphs / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3328583 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q5595249 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Preselective strategies for the optimization of stochastic project networks under resource constraints / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q4130999 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3910305 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Scheduling Problems with a Singular Solution / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Almost all comparability graphs are UPO / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3686754 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3661627 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3683903 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q5187058 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q4058784 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Scheduling Interval-Ordered Tasks / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q4181597 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3910288 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Scheduling of project networks / rank | |||
Normal rank | |||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/0166-218x(86)90008-9 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W1999337916 / rank | |||
Normal rank |
Latest revision as of 10:51, 30 July 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Schedule-induced posets |
scientific article |
Statements
Schedule-induced posets (English)
0 references
1986
0 references
Schedules are a basic tool in the treatment of project networks and sequencing problems. For many questions, however, it is not the schedule itself but a partial order (poset) naturally induced on the set of activities that is really relied on. In fact, this correspondence of the usually uncountably many schedules to a finite system of posets was a key to many recent results in this field and constitutes the discrete character of the described problems, all the more so as additional properties of the respective schedules can very often be reflected in related properties of these induced posets. The present paper gives insights into the class of those posets that can be induced by schedules. An immediate observation is that schedule- induced posets are just the interval orders. More involved characterizations are concerned with the possible 'local optimality' of such structures. One such property is the existence of activity durations that will result in a project duration of the considered poset that is shorter (simultaneously) than the duration of all its extensions. A similar, related characterization for general regular cost functions (in particular tardiness cost) is also included, as are insights into 'best' activity durations with the mentioned properties. The paper closes with some remarks and numerical data on the considered class of posets as a whole.
0 references
critical path analysis
0 references
Fibonacci numbers
0 references
regular measures of performance
0 references
project networks
0 references
sequencing
0 references
finite system of posets
0 references
schedule-induced posets
0 references
interval orders
0 references
0 references