Concurrent open-pit mine production and in-pit crushing–conveying system planning (Q5059445): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/0305215x.2019.1678150 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2989440164 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A strengthened formulation and cutting planes for the open pit mine production scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity / rank
 
Normal rank
Property / cites work
 
Property / cites work: An MILP approach to multi-location, multi-period equipment selection for surface mining with case studies / rank
 
Normal rank
Property / cites work
 
Property / cites work: An application of branch and cut to open pit mine scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A New Algorithm for the Open-Pit Mine Production Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A sliding time window heuristic for open pit mine block sequencing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Aggregation heuristic for the open-pit block scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tailored Lagrangian relaxation for the open pit block sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Large-scale multi-period precedence constrained knapsack problem: A mining application / rank
 
Normal rank
Property / cites work
 
Property / cites work: The new Fundamental Tree Algorithm for production scheduling of open pit mines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Long term production planning of open pit mines by ant colony optimization / rank
 
Normal rank

Latest revision as of 05:51, 31 July 2024

scientific article; zbMATH DE number 7637192
Language Label Description Also known as
English
Concurrent open-pit mine production and in-pit crushing–conveying system planning
scientific article; zbMATH DE number 7637192

    Statements

    Concurrent open-pit mine production and in-pit crushing–conveying system planning (English)
    0 references
    0 references
    0 references
    23 December 2022
    0 references
    open-pit mining
    0 references
    haul fleet sizing
    0 references
    mine production planning
    0 references
    in-pit crushing and conveying system planning
    0 references

    Identifiers