Influence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain management (Q5244314): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Created claim: Wikidata QID (P12): Q129734554, #quickstatements; #temporary_batch_1724938403945
(2 intermediate revisions by 2 users not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1051/ro/2018041 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2805723483 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Controlling setup cost in \((Q, r, L)\) inventory model with defective items / rank
 
Normal rank
Property / cites work
 
Property / cites work: The uncertain premium principle based on the distortion function / rank
 
Normal rank
Property / cites work
 
Property / cites work: Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: An optimal shipment strategy for imperfect items in a stock-out situation / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated inventory model with variable transportation cost, two-stage inspection, and defective items / rank
 
Normal rank
Property / cites work
 
Property / cites work: Supply chain coordination with variable backorder, inspections, and discount policy for fixed lifetime products / rank
 
Normal rank
Property / cites work
 
Property / cites work: A production-inventory model with probabilistic deterioration in two-echelon supply chain management / rank
 
Normal rank
Property / cites work
 
Property / cites work: Effect of unequal lot sizes, variable setup cost, and carbon emission cost in a supply chain model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Periodic review fuzzy inventory model with variable lead time and fuzzy demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated vendor-buyer supply chain model with Vendor's setup cost reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: Product inspection policy for an imperfect production system with inspection errors and warranty cost / rank
 
Normal rank
Property / cites work
 
Property / cites work: Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model / rank
 
Normal rank
Property / cites work
 
Property / cites work: The economic lot size of the integrated vendor-buyer inventory system derived without derivatives: a simple derivation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Efficient lot-sizing under differential transportation cost structure for serially distributed warehouses / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated multi-lot-size production inventory model for deteriorating item / rank
 
Normal rank
Property / cites work
 
Property / cites work: A control-chart-based queueing approach for service facility maintenance with energy-delay tradeoff / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal production and shipment models for a single-vendor--single-buyer integrated system / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q129734554 / rank
 
Normal rank

Revision as of 14:46, 29 August 2024

scientific article; zbMATH DE number 7134293
Language Label Description Also known as
English
Influence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain management
scientific article; zbMATH DE number 7134293

    Statements

    Influence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain management (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    20 November 2019
    0 references
    supply chain management
    0 references
    unequal shipment size
    0 references
    discrete setup cost reduction
    0 references
    transportation cost
    0 references
    carbon emission cost
    0 references
    Stackelberg game
    0 references

    Identifiers