The two-stage model of entrepreneurs financing based on the entry/exit decision (Q1727255): Difference between revisions
From MaRDI portal
Set profile property. |
Created claim: Wikidata QID (P12): Q129651538, #quickstatements; #temporary_batch_1730771013509 |
||
(One intermediate revision by one other user not shown) | |||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1155/2018/7902985 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2808721969 / rank | |||
Normal rank | |||
Property / Wikidata QID | |||
Property / Wikidata QID: Q129651538 / rank | |||
Normal rank |
Latest revision as of 02:44, 5 November 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | The two-stage model of entrepreneurs financing based on the entry/exit decision |
scientific article |
Statements
The two-stage model of entrepreneurs financing based on the entry/exit decision (English)
0 references
20 February 2019
0 references
Summary: Normally entrepreneur would raise fund from angel investors during the initial round. If the venture program was by then successful, the entrepreneur would then continue the fund-raising process from venture capitalist. By adopting the convertible preferred stock, we managed to construct the two-stage angel investment decision process. This research reveals the following: (1) The probability of the first stage's success has negative relationships with levels of priority dividend in both first and second stages, as well as with the venture capitalist's proportion of shares. (2) The probability of the second stage's success has negative relationships with the venture capitalist's proportion of shares and the dividend level of both first and second stage funding. (3) There has been a threshold of dividend distribution, which belongs to angel investor. While the level of angel investor's shares is higher than the threshold, AN would decide to join the second phase of the program; otherwise, AN would exit the project at the end of the first stage.
0 references