An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (Q433107): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Normalize DOI.
 
(8 intermediate revisions by 8 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ins.2011.06.014 / rank
Normal rank
 
Property / author
 
Property / author: Ling Wang / rank
Normal rank
 
Property / author
 
Property / author: Ling Wang / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B35 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 6055701 / rank
 
Normal rank
Property / zbMATH Keywords
 
multi-mode resource-constrained project scheduling
Property / zbMATH Keywords: multi-mode resource-constrained project scheduling / rank
 
Normal rank
Property / zbMATH Keywords
 
shuffled frog-leaping algorithm
Property / zbMATH Keywords: shuffled frog-leaping algorithm / rank
 
Normal rank
Property / zbMATH Keywords
 
multi-mode serial schedule generation scheme
Property / zbMATH Keywords: multi-mode serial schedule generation scheme / rank
 
Normal rank
Property / zbMATH Keywords
 
multi-mode permutation based local search
Property / zbMATH Keywords: multi-mode permutation based local search / rank
 
Normal rank
Property / zbMATH Keywords
 
multi-mode forward
Property / zbMATH Keywords: multi-mode forward / rank
 
Normal rank
Property / zbMATH Keywords
 
backward improvement
Property / zbMATH Keywords: backward improvement / rank
 
Normal rank
Property / zbMATH Keywords
 
combined local search
Property / zbMATH Keywords: combined local search / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: PSPLIB / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ins.2011.06.014 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1971534795 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Differential evolution for solving multi-mode resource-constrained project scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling with multiple modes: A genetic algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simulated annealing for multi-mode resource-constrained project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation / rank
 
Normal rank
Property / cites work
 
Property / cites work: PSPLIB -- a project scheduling problem library / rank
 
Normal rank
Property / cites work
 
Property / cites work: Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: An iterative scheduling technique for resource-constrained project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: An exact algorithm for project scheduling with multiple modes / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.INS.2011.06.014 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 17:25, 9 December 2024

scientific article
Language Label Description Also known as
English
An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem
scientific article

    Statements

    An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (English)
    0 references
    0 references
    0 references
    13 July 2012
    0 references
    multi-mode resource-constrained project scheduling
    0 references
    shuffled frog-leaping algorithm
    0 references
    multi-mode serial schedule generation scheme
    0 references
    multi-mode permutation based local search
    0 references
    multi-mode forward
    0 references
    backward improvement
    0 references
    combined local search
    0 references

    Identifiers