Minimizing total completion time in two-stage hybrid flow shop with dedicated machines (Q622160): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Import241208061232 (talk | contribs)
Normalize DOI.
 
(3 intermediate revisions by 3 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.cor.2010.10.009 / rank
Normal rank
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2010.10.009 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2089830689 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Branch and bound algorithm for the flow shop with multiple processors / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Complexity of Flowshop and Jobshop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop and Jobshop Schedules: Complexity and Approximation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a two-stage hybrid flow shop with parallel machines at the first stage / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing Total Completion Time in a Two-Machine Flowshop: Analysis of Special Cases / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan in hybrid flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing a hybrid two-stage flowshop with dedicated machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.COR.2010.10.009 / rank
 
Normal rank

Latest revision as of 22:31, 9 December 2024

scientific article
Language Label Description Also known as
English
Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
scientific article

    Statements

    Identifiers