A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times (Q828843): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
Normalize DOI.
 
(4 intermediate revisions by 4 users not shown)
Property / DOI
 
Property / DOI: 10.1007/s10479-020-03558-z / rank
Normal rank
 
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10479-020-03558-z / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W3010345253 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A sample average approximation method for disassembly line balancing problem under uncertainty / rank
 
Normal rank
Property / cites work
 
Property / cites work: Second order conic approximation for disassembly line design with joint probabilistic constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: An exact \(\epsilon\)-constraint method for bi-objective combinatorial optimization problems: Application to the traveling salesman problem with profits / rank
 
Normal rank
Property / cites work
 
Property / cites work: An optimization-based heuristic for the multi-objective undirected capacitated arc routing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Balancing of simple assembly lines under variations of task processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Nonlinear multiobjective optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Distribution-free vessel deployment for liner shipping / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-objective decision model for investment in energy savings and emission reductions in coal mining / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1007/S10479-020-03558-Z / rank
 
Normal rank

Latest revision as of 04:22, 10 December 2024

scientific article
Language Label Description Also known as
English
A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times
scientific article

    Statements

    A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    5 May 2021
    0 references
    disassembly line balancing
    0 references
    different-technology workstations
    0 references
    budget
    0 references
    emission
    0 references
    stochastic processing times
    0 references
    bi-objective distribution-free technique
    0 references

    Identifiers