A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times
From MaRDI portal
Publication:828843
Recommendations
- A dynamic programming approach to a multi-objective disassembly line balancing problem
- An integrated approach for a new flexible multi-product disassembly line balancing problem
- A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time
- Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches
- A disassembly line balancing problem with fixed number of workstations
- Mixed integer programming approaches to partial disassembly line balancing and sequencing problem
- Stochastic assembly line balancing: general bounds and reliability-based branch-and-bound algorithm
- Balancing stochastic two-sided assembly lines: a chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
- A novel constraint programming and simulated annealing for disassembly line balancing problem with and/or precedence and sequence dependent setup times
- An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
Cites work
- A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem
- A multi-objective decision model for investment in energy savings and emission reductions in coal mining
- A sample average approximation method for disassembly line balancing problem under uncertainty
- An exact \(\epsilon\)-constraint method for bi-objective combinatorial optimization problems: Application to the traveling salesman problem with profits
- An optimization-based heuristic for the multi-objective undirected capacitated arc routing problem
- Balancing of simple assembly lines under variations of task processing times
- Distribution-free vessel deployment for liner shipping
- Nonlinear multiobjective optimization
- Second order conic approximation for disassembly line design with joint probabilistic constraints
Cited in
(5)- Novel distribution-free model and method for stochastic disassembly line balancing with limited distributional information
- An integrated approach for lean production using simulation and data envelopment analysis
- A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time
- Constraint programming for multi-line parallel partial disassembly line balancing problem with optional common stations
- Supply chain vulnerability assessment for manufacturing industry
This page was built for publication: A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q828843)