A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times
DOI10.1007/S10479-020-03558-ZzbMATH Open1467.90064OpenAlexW3010345253MaRDI QIDQ828843FDOQ828843
Jun-Kai He, Ming Liu, Feng Chu, Feifeng Zheng
Publication date: 5 May 2021
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-020-03558-z
stochastic processing timesbudgetemissiondisassembly line balancingbi-objective distribution-free techniquedifferent-technology workstations
Multi-objective and goal programming (90C29) Applications of mathematical programming (90C90) Stochastic programming (90C15)
Cites Work
- Nonlinear multiobjective optimization
- An exact \(\epsilon\)-constraint method for bi-objective combinatorial optimization problems: Application to the traveling salesman problem with profits
- Balancing of simple assembly lines under variations of task processing times
- Distribution-free vessel deployment for liner shipping
- Second order conic approximation for disassembly line design with joint probabilistic constraints
- A sample average approximation method for disassembly line balancing problem under uncertainty
- An optimization-based heuristic for the multi-objective undirected capacitated arc routing problem
- A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem
- A multi-objective decision model for investment in energy savings and emission reductions in coal mining
Cited In (5)
- A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time
- Constraint programming for multi-line parallel partial disassembly line balancing problem with optional common stations
- Novel distribution-free model and method for stochastic disassembly line balancing with limited distributional information
- An integrated approach for lean production using simulation and data envelopment analysis
- Supply chain vulnerability assessment for manufacturing industry
Recommendations
- A dynamic programming approach to a multi-objective disassembly line balancing problem π π
- An integrated approach for a new flexible multi-product disassembly line balancing problem π π
- A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time π π
- Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches π π
- A disassembly line balancing problem with fixed number of workstations π π
- Mixed integer programming approaches to partial disassembly line balancing and sequencing problem π π
- Stochastic assembly line balancing: general bounds and reliability-based branch-and-bound algorithm π π
- Balancing stochastic two-sided assembly lines: a chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm π π
- A novel constraint programming and simulated annealing for disassembly line balancing problem with and/or precedence and sequence dependent setup times π π
- An optimal piecewise-linear program for the U-line balancing problem with stochastic task times π π
This page was built for publication: A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q828843)