A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times
From MaRDI portal
Publication:828843
DOI10.1007/s10479-020-03558-zzbMath1467.90064OpenAlexW3010345253MaRDI QIDQ828843
Ming Liu, Feng Chu, Feifeng Zheng, Jun-Kai He
Publication date: 5 May 2021
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-020-03558-z
emissionbudgetstochastic processing timesdisassembly line balancingbi-objective distribution-free techniquedifferent-technology workstations
Applications of mathematical programming (90C90) Multi-objective and goal programming (90C29) Stochastic programming (90C15)
Related Items (5)
Novel distribution-free model and method for stochastic disassembly line balancing with limited distributional information ⋮ Constraint programming for multi-line parallel partial disassembly line balancing problem with optional common stations ⋮ An integrated approach for lean production using simulation and data envelopment analysis ⋮ A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time ⋮ Supply chain vulnerability assessment for manufacturing industry
Cites Work
- Distribution-free vessel deployment for liner shipping
- Second order conic approximation for disassembly line design with joint probabilistic constraints
- A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem
- A sample average approximation method for disassembly line balancing problem under uncertainty
- An exact \(\epsilon\)-constraint method for bi-objective combinatorial optimization problems: Application to the traveling salesman problem with profits
- Nonlinear multiobjective optimization
- A multi-objective decision model for investment in energy savings and emission reductions in coal mining
- An optimization-based heuristic for the multi-objective undirected capacitated arc routing problem
- Balancing of simple assembly lines under variations of task processing times
This page was built for publication: A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times