Second order conic approximation for disassembly line design with joint probabilistic constraints
From MaRDI portal
(Redirected from Publication:320132)
Recommendations
- A sample average approximation method for disassembly line balancing problem under uncertainty
- Profit-oriented disassembly-line balancing
- An integrated approach for a new flexible multi-product disassembly line balancing problem
- Novel distribution-free model and method for stochastic disassembly line balancing with limited distributional information
- Mixed integer programming approaches to partial disassembly line balancing and sequencing problem
Cites work
- scientific article; zbMATH DE number 2107836 (Why is no real title available?)
- A Preference Order Dynamic Program for Stochastic Assembly Line Balancing
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
- A chance-constrained approach to stochastic line balancing problem
- A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
- A cost minimization procedure for mixed model production lines with normally distributed task times
- A decomposition based solution algorithm for U-type assembly line balancing with interval data
- A dual-uncertainty-based chance-constrained model for municipal solid waste management
- A heuristic algorithm for a chance constrained stochastic program
- A joint chance-constrained programming model with row dependence
- A linear programming approach for linear programs with probabilistic constraints
- A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem
- A sample average approximation method for disassembly line balancing problem under uncertainty
- A second-order cone programming approach for linear programs with joint probabilistic constraints
- A survey on problems and methods in generalized assembly line balancing
- ASALBP: the alternative subgraphs assembly line balancing problem
- An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
- An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
- Applications of second-order cone programming
- Balancing stochastic two-sided assembly lines: a chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
- Bonferroni inequalities
- Chance constrained problems: penalty reformulation and performance of sample approximation technique
- Chance-Constrained Programming with Joint Constraints
- Convex Approximations of Chance Constrained Programs
- Convex piecewise-linear fitting
- Disassembly line in product recovery
- Expectation and chance-constrained models and algorithms for insuring critical paths
- Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
- Genetic algorithm based technique for solving chance constrained problems
- Modeling and analysis of a mixed‐model assembly line with stochastic operation times
- On safe tractable approximations of chance constraints
- Optimally solving the alternative subgraphs assembly line balancing problem
- Optimizing financial and physical assets with chance-constrained programming in the electrical industry
- Profit-oriented disassembly-line balancing
- Second-order cone programming
- Stability analysis of an optimal balance for an assembly line with fixed cycle time
- Stability measure for a generalized assembly line balancing problem
- Stochastic assembly line balancing using beam search
- The ASALB Problem with Processing Alternatives Involving Different Tasks: Definition, Formalization and Resolution
- The stochastic U-line balancing problem
- The stochastic U-line balancing problem: a heuristic procedure
- Uniform quasi-concavity in probabilistic constrained stochastic programming
Cited in
(9)- Flexibility in manufacturing system design: a review of recent approaches from operations research
- A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times
- Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations
- An integrated approach for a new flexible multi-product disassembly line balancing problem
- Stochastic assembly line balancing: general bounds and reliability-based branch-and-bound algorithm
- Eco-friendly container transshipment route scheduling problem with repacking operations
- Novel distribution-free model and method for stochastic disassembly line balancing with limited distributional information
- Solving the accessibility windows assembly line problem level 1 and variant 1 (AWALBP-L1-1) with precedence constraints
- A branch, bound, and remember algorithm for the simple disassembly line balancing problem
This page was built for publication: Second order conic approximation for disassembly line design with joint probabilistic constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q320132)