An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
From MaRDI portal
Publication:2569065
DOI10.1016/j.ejor.2004.07.027zbMath1083.90029OpenAlexW2000406736MaRDI QIDQ2569065
Wen-Chyuan Chiang, Timothy L. Urban
Publication date: 17 October 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2004.07.027
Management decision making, including multiple objectives (90B50) Production models (90B30) Special problems of linear programming (transportation, multi-index, data envelopment analysis, etc.) (90C08)
Related Items
Maximizing the robustness for simple assembly lines with fixed cycle time and limited number of workstations, A classification of assembly line balancing problems, Second order conic approximation for disassembly line design with joint probabilistic constraints, Designing energy-efficient serial production lines: the unpaced synchronous line-balancing problem, A decomposition based solution algorithm for U-type assembly line balancing with interval data, Balancing of parallel U-shaped assembly lines, A chance-constrained approach to stochastic line balancing problem, Stochastic assembly line balancing: general bounds and reliability-based branch-and-bound algorithm, A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time, Balancing of simple assembly lines under variations of task processing times, Rules-based heuristic approach for the U-shaped assembly line balancing problem, Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
- Note. Optimal Balancing of U-Shaped Assembly Lines
- Synchronous Unpaced Flow Lines with Worker Differences and Overtime Cost
- An Integer Programming Algorithm with Network Cuts for Solving the Assembly Line Balancing Problem
- A Dynamic Programming Approach to Sequencing Problems
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
- A Dynamic Programming Approach to Stochastic Assembly Line Balancing
- Eureka: A Hybrid System for Assembly Line Balancing
- A Preference Order Dynamic Program for Stochastic Assembly Line Balancing
- Dynamic Programming Solution of Sequencing Problems with Precedence Constraints
- ULINO: Optimally balancing U-shaped JIT assembly lines
- Balancing of U-type assembly systems using simulated annealing
- The U-line Line Balancing Problem