Maximizing the robustness for simple assembly lines with fixed cycle time and limited number of workstations
DOI10.1016/J.DAM.2016.03.005zbMATH Open1343.90041OpenAlexW2320817715MaRDI QIDQ284850FDOQ284850
Authors: André Rossi, Olga Battaïa, Alexandre Dolgui, Evgeny Gurevsky
Publication date: 18 May 2016
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.dam.2016.03.005
Recommendations
- Stability factor for robust balancing of simple assembly lines under uncertainty
- Robust balancing of transfer lines with blocks of uncertain parallel tasks under fixed cycle time and space restrictions
- Balancing of simple assembly lines under variations of task processing times
- The stability radius of an optimal line balance with maximum efficiency for a simple assembly line
- Stability analysis of an optimal balance for an assembly line with fixed cycle time
Linear programming (90C05) Deterministic scheduling theory in operations research (90B35) Mixed integer programming (90C11) Production models (90B30)
Cites Work
- Title not available (Why is that?)
- Global optimization in action. Continuous and Lipschitz optimization: algorithms, implementations and applications
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
- An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
- Mixed integer programming computation
- Stability aspects of the traveling salesman problem based on \(k\)-best solutions
- Maximizing the production rate in simple assembly line balancing -- A branch and bound procedure
- Some concepts of stability analysis in combinatorial optimization
- Stability measure for a generalized assembly line balancing problem
- Balancing of simple assembly lines under variations of task processing times
- Balancing stochastic two-sided assembly lines: a chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
- Stability analysis of an optimal balance for an assembly line with fixed cycle time
- A heuristic solution for fuzzy mixed-model line balancing problem
- Technical Note—Assembly-Line Balancing: Zero-One Programming with Fibonacci Search
- Scenario based robust line balancing: Computational complexity
- Title not available (Why is that?)
- Stability and Regularization of Vector Problems of Integer Linear Programming
- A chance-constrained approach to stochastic line balancing problem
Cited In (9)
- A new upper bound based on Dantzig-Wolfe decomposition to maximize the stability radius of a simple assembly line under uncertainty
- Title not available (Why is that?)
- Robust balancing of transfer lines with blocks of uncertain parallel tasks under fixed cycle time and space restrictions
- MIP-Based Heuristics for a Robust Transfer Lines Balancing Problem
- Stability factor for robust balancing of simple assembly lines under uncertainty
- Solving robust bin-packing problems with a branch-and-price approach
- The multilevel facility location and pricing problems: the computational complexity and the stability analysis
- A survivable variant of the ring star problem
- Stability analysis of an optimal balance for an assembly line with fixed cycle time
This page was built for publication: Maximizing the robustness for simple assembly lines with fixed cycle time and limited number of workstations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q284850)