Synchronous Unpaced Flow Lines with Worker Differences and Overtime Cost
From MaRDI portal
Publication:3116744
DOI10.1287/mnsc.46.3.421.12064zbMath1231.90162OpenAlexW2169004245MaRDI QIDQ3116744
Kenneth H. Doerr, Theodore D. Klastorin, Michael J. Magazine
Publication date: 12 February 2012
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.46.3.421.12064
Related Items (6)
Designing energy-efficient serial production lines: the unpaced synchronous line-balancing problem ⋮ Open shop scheduling with synchronization ⋮ The stochastic U-line balancing problem: a heuristic procedure ⋮ Branch and bound procedures for solving the assembly line worker assignment and balancing problem: Application to sheltered work centres for disabled ⋮ Stochastic assembly line balancing using beam search ⋮ An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
This page was built for publication: Synchronous Unpaced Flow Lines with Worker Differences and Overtime Cost