A disassembly line balancing problem with fixed number of workstations
From MaRDI portal
Publication:321005
DOI10.1016/J.EJOR.2015.09.004zbMATH Open1346.90614OpenAlexW2102143815MaRDI QIDQ321005FDOQ321005
Sencer Yeralan, Meral Azizoğlu, Eda Göksoy Kalaycılar
Publication date: 7 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2015.09.004
Approximation methods and heuristics in mathematical programming (90C59) Integer programming (90C10) Production models (90B30)
Cites Work
- Technical Note—Assembly-Line Balancing: Zero-One Programming with Fibonacci Search
- A sample average approximation method for disassembly line balancing problem under uncertainty
- Disassembly sequencing: A survey
- Disassembly line in product recovery
- Profit-oriented disassembly-line balancing
- A balancing method and genetic algorithm for disassembly line balancing
- Optimal disassembly of complex products
- Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
Cited In (15)
- An exact solution method for multi-manned disassembly line design with and/or precedence relations
- A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times
- A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time
- Capacitated disassembly scheduling under stochastic yield and demand
- Robotic disassembly line balancing problem: a mathematical model and ant colony optimization approach
- Constraint programming for multi-line parallel partial disassembly line balancing problem with optional common stations
- A dynamic programming approach to a multi-objective disassembly line balancing problem
- Towards circular economy in production planning: challenges and opportunities
- Balancing of two-sided disassembly lines: problem definition, MILP model and genetic algorithm approach
- A hybrid algorithm for the vehicle routing problem with and/or precedence constraints and time windows
- Mixed integer programming approaches to partial disassembly line balancing and sequencing problem
- A novel constraint programming and simulated annealing for disassembly line balancing problem with and/or precedence and sequence dependent setup times
- Sustainable operations
- Disassembly line optimization with reinforcement learning
- A branch, bound, and remember algorithm for the simple disassembly line balancing problem
This page was built for publication: A disassembly line balancing problem with fixed number of workstations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q321005)