Optimal due date assignment and resource allocation in a group technology scheduling environment (Q991385): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Import241208061232 (talk | contribs)
Normalize DOI.
 
(2 intermediate revisions by 2 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.cor.2010.03.012 / rank
Normal rank
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2010.03.012 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2063886660 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two parallel machine sequencing problems involving controllable job processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing mean absolute deviation of completion times about a common due date / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing Mean Squared Deviation of Completion Times About a Common Due Date / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on a due-date assignment on a two-machine flow-shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with controllable release dates and processing times: total completion time minimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of the state-of-the-art of common due date assignment and scheduling research / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4758141 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3775317 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling subject to deadlines and resource dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4789855 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine group scheduling with resource dependent setup and processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batch scheduling and common due-date assignment on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Group scheduling with controllable setup and processing times: minimizing total weighted completion time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling to minimize costs for earliness and number of tardy jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization of the machining economics problem for a multistage transfer machine under failure, opportunistic and integrated replacement strategies / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new bounding mechanism for the CNC machine scheduling problems with controllable processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases / rank
 
Normal rank
Property / cites work
 
Property / cites work: A common due-data assignment problem on parallel identical machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with a variable common due date and resource-dependent processing times. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing completion time variance with compressible processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of results for sequencing problems with controllable processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine sequencing with controllable processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4739657 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single and two-resource allocation algorithms for minimizing the maximal lateness in a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the total weighted flow time in a single machine with controllable processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine batch scheduling to minimize total completion time and resource consumption costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of scheduling with controllable processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with controllable release and processing parameters / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Multiple Variable-Speed Machines / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.COR.2010.03.012 / rank
 
Normal rank

Latest revision as of 11:30, 10 December 2024

scientific article
Language Label Description Also known as
English
Optimal due date assignment and resource allocation in a group technology scheduling environment
scientific article

    Statements

    Optimal due date assignment and resource allocation in a group technology scheduling environment (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    7 September 2010
    0 references
    single-machine scheduling
    0 references
    family due date assignment method
    0 references
    group technology
    0 references
    earliness-tardiness
    0 references
    resource allocation
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers