Structure and simulation evaluation of an integrated real-time rescheduling system for railway networks (Q1024071): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Normalize DOI.
 
(2 intermediate revisions by 2 users not shown)
Property / DOI
 
Property / DOI: 10.1007/s11067-008-9085-4 / rank
Normal rank
 
Property / OpenAlex ID
 
Property / OpenAlex ID: W2025012523 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The influence of anticipating train driving on the dispatching process in railway conflict situations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Design of a railway scheduling model for dense services / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling manufacturing systems: A framework of strategies, policies, and methods / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1007/S11067-008-9085-4 / rank
 
Normal rank

Latest revision as of 13:27, 10 December 2024

scientific article
Language Label Description Also known as
English
Structure and simulation evaluation of an integrated real-time rescheduling system for railway networks
scientific article

    Statements

    Structure and simulation evaluation of an integrated real-time rescheduling system for railway networks (English)
    0 references
    0 references
    0 references
    0 references
    16 June 2009
    0 references
    real-time rescheduling
    0 references
    microscopic railway simulation
    0 references
    rail traffic operation
    0 references

    Identifiers