Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel (Q2184047): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Import241208061232 (talk | contribs)
Normalize DOI.
 
(5 intermediate revisions by 5 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2020.02.021 / rank
Normal rank
 
Property / describes a project that uses
 
Property / describes a project that uses: COMET / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2020.02.021 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W3005680372 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A fast heuristic for quay crane scheduling with interference constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of berth allocation and quay crane scheduling problems in container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: A follow-up survey of berth allocation and quay crane scheduling problems in container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: A generalized classification scheme for crane scheduling with interference / rank
 
Normal rank
Property / cites work
 
Property / cites work: Storage yard operations in container terminals: literature overview, trends, and research directions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Transport operations in container terminals: literature overview, trends, research directions and classification scheme / rank
 
Normal rank
Property / cites work
 
Property / cites work: The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion / rank
 
Normal rank
Property / cites work
 
Property / cites work: An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated scheduling of crane handling and truck transportation in a maritime container terminal / rank
 
Normal rank
Property / cites work
 
Property / cites work: A crane scheduling method for port container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling and solving rich quay crane scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A <i>m</i>‐parallel crane scheduling problem with a non‐crossing constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures / rank
 
Normal rank
Property / cites work
 
Property / cites work: The quay crane scheduling problem with time windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal / rank
 
Normal rank
Property / cites work
 
Property / cites work: The hybrid flow shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search heuristic for the quay crane scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Container terminal operation and operations research -- a classification and literature review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling and solution of the joint quay crane and truck scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrating simulation and optimization to schedule loading operations in container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling quay cranes and yard trucks for unloading operations in container ports / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crane scheduling with non-crossing constraint / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2020.02.021 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 09:32, 17 December 2024

scientific article
Language Label Description Also known as
English
Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel
scientific article

    Statements

    Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    27 May 2020
    0 references
    OR in maritime industry
    0 references
    container terminal
    0 references
    container unloading/loading problem
    0 references
    mixed integer programming
    0 references
    constraint programming
    0 references

    Identifiers