Instantaneous Power Peak Reduction and Train Scheduling Desynchronization in Subway Systems (Q4233775): Difference between revisions
From MaRDI portal
Added link to MaRDI item. |
Normalize DOI. |
||
(2 intermediate revisions by 2 users not shown) | |||
Property / DOI | |||
Property / DOI: 10.1287/trsc.31.4.312 / rank | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1287/trsc.31.4.312 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2143996719 / rank | |||
Normal rank | |||
Property / DOI | |||
Property / DOI: 10.1287/TRSC.31.4.312 / rank | |||
Normal rank |
Latest revision as of 11:01, 29 December 2024
scientific article; zbMATH DE number 1264833
Language | Label | Description | Also known as |
---|---|---|---|
English | Instantaneous Power Peak Reduction and Train Scheduling Desynchronization in Subway Systems |
scientific article; zbMATH DE number 1264833 |
Statements
Instantaneous Power Peak Reduction and Train Scheduling Desynchronization in Subway Systems (English)
0 references
29 June 1999
0 references
overall power peaks
0 references
operational constraints
0 references
subway system
0 references