Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Import241208061232 (talk | contribs)
Normalize DOI.
 
(4 intermediate revisions by 4 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.amc.2006.05.106 / rank
Normal rank
 
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.amc.2006.05.106 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2023176163 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Cyclic scheduling to minimize inventory in a batch flow line / rank
 
Normal rank
Property / cites work
 
Property / cites work: Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage Production / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3149922 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing, lot sizing and scheduling of several products in job shops: The common cycle approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: The impact of sequencing decisions on multi-item lot sizing and scheduling in flow shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid genetic algorithm for the economic lot-scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers / rank
 
Normal rank
Property / cites work
 
Property / cites work: An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities. / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4692508 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for scheduling in a flow shop with multiple processors / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.AMC.2006.05.106 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 06:01, 10 December 2024

scientific article
Language Label Description Also known as
English
Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case
scientific article

    Statements

    Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (English)
    0 references
    0 references
    13 February 2007
    0 references
    flexible flow line
    0 references
    lot scheduling
    0 references
    metaheuristics
    0 references
    finite horizon
    0 references
    limited intermediate buffers
    0 references

    Identifiers