A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10951-015-0416-2 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2117593136 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the makespan for the flow shop scheduling problem with availability constraints. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production planning and preventive maintenance in deteriorating production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with tool changes to minimize total completion time: Basic results and SPT performance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling two-stage hybrid flow shop with availability constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a Dynamic Aircraft Repair Shop with Limited Repair Resources / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling preventive railway maintenance activities / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3624051 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Partitioning procedures for solving mixed-variables programming problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: STOCHASTIC SCHEDULING WITH PREEMPTIVE-REPEAT MACHINE BREAKDOWNS TO MINIMIZE THE EXPECTED WEIGHTED FLOW TIME / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stochastic scheduling subject to machine breakdowns: The preemptive-repeat model with discounted reward and other criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Coordination of Outsourced Operations at a Third-Party Facility Subject to Booking, Overtime, and Tardiness Costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling with flexible and periodic maintenance / rank
 
Normal rank
Property / cites work
 
Property / cites work: A review of multi-component maintenance models with economic dependence / rank
 
Normal rank
Property / cites work
 
Property / cites work: Joint replacement in an operational planning phase / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multicommodity Distribution System Design by Benders Decomposition / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling and solving the periodic maintenance problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop scheduling research after five decades / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated cost model for production scheduling and perfect maintenance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Joint job scheduling and preventive maintenance on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid method for the planning and scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Planning and Scheduling by Logic-Based Benders Decomposition / rank
 
Normal rank
Property / cites work
 
Property / cites work: Logic-based Benders decomposition / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with a rate-modifying activity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling with periodic maintenance to minimize makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximation schemes for scheduling on a single machine subject to cumulative deterioration and maintenance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with an availability constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine flowshop scheduling with availability constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4821818 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4124328 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling with periodic maintenance and nonresumable jobs. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Maintenance Policies for Stochastically Failing Equipment: A Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a maintenance activity and due-window assignment on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a deteriorating maintenance activity on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525911 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Considering scheduling and preventive maintenance in the flowshop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling jobs under increasing linear machine maintenance time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with limited machine availability / rank
 
Normal rank
Property / cites work
 
Property / cites work: The just-in-time scheduling problem in a flow-shop scheduling system / rank
 
Normal rank
Property / cites work
 
Property / cites work: A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of maintenance policies of deteriorating systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling with periodic maintenance to minimize makespan revisited / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 02:18, 11 July 2024

scientific article
Language Label Description Also known as
English
A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines
scientific article

    Statements

    A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (English)
    0 references
    12 November 2015
    0 references
    integrated decision making
    0 references
    maintenance planning
    0 references
    production scheduling
    0 references
    machine deterioration
    0 references
    logic-based Benders decomposition
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers