Pages that link to "Item:Q892903"
From MaRDI portal
The following pages link to A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903):
Displayed 4 items.
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- A hybrid DBH-VNS for high-end equipment production scheduling with machine failures and preventive maintenance activities (Q2222085) (← links)
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem (Q2664314) (← links)
- Logic-Based Benders Decomposition for Large-Scale Optimization (Q3296379) (← links)