Constructive heuristic algorithms for the open shop problem (Q1310611): Difference between revisions
From MaRDI portal
Created claim: Wikidata QID (P12): Q57634033, #quickstatements; #temporary_batch_1705817641484 |
ReferenceBot (talk | contribs) Changed an Item |
||
(4 intermediate revisions by 3 users not shown) | |||
Property / author | |||
Property / author: Heidemarie Bräsel / rank | |||
Property / author | |||
Property / author: Thomas Tautenhahn / rank | |||
Property / author | |||
Property / author: Frank Werner / rank | |||
Property / reviewed by | |||
Property / reviewed by: Ya. M. Shafransky / rank | |||
Property / author | |||
Property / author: Heidemarie Bräsel / rank | |||
Normal rank | |||
Property / author | |||
Property / author: Thomas Tautenhahn / rank | |||
Normal rank | |||
Property / author | |||
Property / author: Frank Werner / rank | |||
Normal rank | |||
Property / reviewed by | |||
Property / reviewed by: Ya. M. Shafransky / rank | |||
Normal rank | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: On the number of feasible schedules of the open-shop-problem-an application of special latin rectangles / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3496141 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Tabu Search—Part I / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Open Shop Scheduling to Minimize Finish Time / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3899811 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Benchmarks for basic scheduling problems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Insertion techniques for the heuristic solution of the job shop problem / rank | |||
Normal rank | |||
links / mardi / name | links / mardi / name | ||
Latest revision as of 11:12, 22 May 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Constructive heuristic algorithms for the open shop problem |
scientific article |
Statements
Constructive heuristic algorithms for the open shop problem (English)
0 references
26 September 1994
0 references
The \(m\)-machine open shop scheduling problem without preemption is considered. Two type of heuristic algorithms to minimize the maximum completion time (makespan) are proposed. Heuristics of the first type generate so-called rank-minimal schedules. Their time complexity varies from \(O((\max\{n,m\})^ 3\log(\max\{n,m\}))\) to \(O((\max\{n,m\})^ 4)\), where \(n\) is the number of jobs. The second type heuristic is a special restricted branch and bound algorithm. Its time complexity is \(O(n^ 2 m^ 2)\). Presented algorithms are tested on different benchmark problems.
0 references
makespan
0 references
\(m\)-machine open shop scheduling
0 references
heuristic
0 references
maximum completion time
0 references
branch and bound
0 references
0 references