Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first (Q853750): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10696-005-5992-6 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2088401120 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: AGV dispatching based on workload balancing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A dispatching method for automated guided vehicles by using a bidding concept / rank
 
Normal rank
Property / cites work
 
Property / cites work: Connecting transport AMHS in a wafer fab / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab / rank
 
Normal rank
Property / cites work
 
Property / cites work: Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Determination of optimal AGV fleet size for an FMS / rank
 
Normal rank

Latest revision as of 23:16, 24 June 2024

scientific article
Language Label Description Also known as
English
Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first
scientific article

    Statements

    Identifiers