A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags (Q929315): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Import241208061232 (talk | contribs)
Normalize DOI.
 
(3 intermediate revisions by 3 users not shown)
Property / DOI
 
Property / DOI: 10.1007/s11227-007-0158-9 / rank
Normal rank
 
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s11227-007-0158-9 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2029066203 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tight LP bounds for resource constrained project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A linear programming and constraint propagation-based lower bound for the RCPSP / rank
 
Normal rank
Property / cites work
 
Property / cites work: Vague knowledge search in the design for outsourcing using fuzzy decision tree / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling. A research handbook. / rank
 
Normal rank
Property / cites work
 
Property / cites work: The multi-mode resource-constrained project scheduling problem with generalized precedence relations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling with time windows. From theory to applications. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Activity nets: A guided tour through some recent developments / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling with multiple modes: A comparison of exact algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags / rank
 
Normal rank
Property / cites work
 
Property / cites work: Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4437036 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1007/S11227-007-0158-9 / rank
 
Normal rank

Latest revision as of 08:27, 10 December 2024

scientific article
Language Label Description Also known as
English
A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
scientific article

    Statements

    A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags (English)
    0 references
    17 June 2008
    0 references
    Multi-mode
    0 references
    Rectangle packing
    0 references
    Resource constrained
    0 references
    Time lags
    0 references
    Time windows
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references