Optimal feedback production planning in a stochastic two-machine flowshop (Q1330537): Difference between revisions
From MaRDI portal
Latest revision as of 15:59, 22 May 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Optimal feedback production planning in a stochastic two-machine flowshop |
scientific article |
Statements
Optimal feedback production planning in a stochastic two-machine flowshop (English)
0 references
21 July 1994
0 references
From the abstract by the authors: ``We consider a production planning problem in a two-machine flowshop subject to breakdown and repair of machines and subject to non-negativity constraints on work-in-process. The machine capacities and demand processes are assumed to be finite state Markov chains. The problem is to choose the rate of production over time so as to minimize the expected discounted cost of production and inventory/backlog over an infinite horizon. The problem is formulated as a stochastic dynamic programming problem. It is shown that the value function of the problem is locally Lipschitz and is a viscosity solution to the dynamic programming equation together with certain boundary conditions''.
0 references
production planning
0 references
two-machine flowshop
0 references
breakdown
0 references
repair
0 references
finite state Markov chains
0 references
infinite horizon
0 references
stochastic dynamic programming
0 references