Time-optimal control in a single machine problem with resource constraints (Q1086143): Difference between revisions
From MaRDI portal
Created a new Item |
ReferenceBot (talk | contribs) Changed an Item |
||
(3 intermediate revisions by 3 users not shown) | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/0005-1098(86)90014-2 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W1987971040 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3220062 / rank | |||
Normal rank | |||
links / mardi / name | links / mardi / name | ||
Latest revision as of 17:09, 17 June 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Time-optimal control in a single machine problem with resource constraints |
scientific article |
Statements
Time-optimal control in a single machine problem with resource constraints (English)
0 references
1986
0 references
The paper deals with time-optimal control of performance of jobs on a single machine. It is assumed that each job is available for processing at the moment which is a positive strictly decreasing continuous function with respect to the amount of a constrained resource (e.g. fuel, raw materials). An algorithm of finding the time-optimal control, i.e. time- optimal permutation of jobs with resource allocation, is presented.
0 references
time-optimal control
0 references
performance of jobs on a single machine
0 references
constrained resource
0 references
resource allocation
0 references