Scheduling <i>n</i> Independent Jobs on <i>m</i> Uniform Machines with both Flowtime and Makespan Objectives: A Parametric Analysis (Q4835449): Difference between revisions
From MaRDI portal
Added link to MaRDI item. |
Set OpenAlex properties. |
||
(3 intermediate revisions by 2 users not shown) | |||
Property / author | |||
Property / author: Michael L. Pinedo / rank | |||
Property / author | |||
Property / author: Michael L. Pinedo / rank | |||
Normal rank | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1287/ijoc.7.1.63 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2000863312 / rank | |||
Normal rank |
Latest revision as of 20:14, 19 March 2024
scientific article; zbMATH DE number 760370
Language | Label | Description | Also known as |
---|---|---|---|
English | Scheduling <i>n</i> Independent Jobs on <i>m</i> Uniform Machines with both Flowtime and Makespan Objectives: A Parametric Analysis |
scientific article; zbMATH DE number 760370 |
Statements
Scheduling <i>n</i> Independent Jobs on <i>m</i> Uniform Machines with both Flowtime and Makespan Objectives: A Parametric Analysis (English)
0 references
9 October 1995
0 references
scheduling
0 references
precedence constraints
0 references
minimum flowtime
0 references
fixed makespan deadline
0 references
sensitivity results
0 references