Safety Stock versus Safety Time in MRP Controlled Production Systems (Q4838329): Difference between revisions
From MaRDI portal
Added link to MaRDI item. |
Set OpenAlex properties. |
||
(One intermediate revision by one other user not shown) | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1287/mnsc.40.12.1678 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W1987290354 / rank | |||
Normal rank |
Latest revision as of 20:33, 19 March 2024
scientific article; zbMATH DE number 772431
Language | Label | Description | Also known as |
---|---|---|---|
English | Safety Stock versus Safety Time in MRP Controlled Production Systems |
scientific article; zbMATH DE number 772431 |
Statements
Safety Stock versus Safety Time in MRP Controlled Production Systems (English)
0 references
13 July 1995
0 references
material requirements planning
0 references
lead time
0 references
safety stock
0 references
single stage manufacturing system
0 references