Pages that link to "Item:Q4838329"
From MaRDI portal
The following pages link to Safety Stock versus Safety Time in MRP Controlled Production Systems (Q4838329):
Displaying 50 items.
- Product contamination in a multi-stage food supply chain (Q319311) (← links)
- Designing energy-efficient serial production lines: the unpaced synchronous line-balancing problem (Q320780) (← links)
- Coordination in a two-stage capacitated supply chain with multiple suppliers (Q418095) (← links)
- The optimal control of just-in-time-based production and distribution systems and performance comparisons with optimized pull systems (Q421584) (← links)
- Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates (Q421585) (← links)
- Analysis of order-up-to-level inventory systems with compound Poisson demand (Q541702) (← links)
- Statistical performance of a multiclass bulk production queueing system (Q596276) (← links)
- The influence of demand variability on the performance of a make-to-stock queue (Q707114) (← links)
- Performance modeling and analysis of integrated logistic chains: an analytic framework (Q707134) (← links)
- Performance evaluation of a multi-echelon production, transportation and distribution system: a matrix analytical approach (Q852979) (← links)
- Value of capacity pooling in supply chains with heterogeneous customers (Q856216) (← links)
- Busy period analysis of queue: lattice path approach (Q969999) (← links)
- Lattice path approach for busy period density of \(GIa/Gb/1\) queues using \(C_{2}\) Coxian distributions (Q988390) (← links)
- Managing an integrated production inventory system with information on the production and demand status and multiple non-unitary demand classes (Q992706) (← links)
- Transient solution of a multiserver Poisson queue with \(N\)-policy (Q1005831) (← links)
- Exact analysis of a two-workstation one-buffer flow line with parallel unreliable machines (Q1014956) (← links)
- Advance demand information and a restricted production capacity: on the optimality of order base-stock policies (Q1018251) (← links)
- Cost-effective inventory control in a value-added manufacturing system (Q1027537) (← links)
- Histogram based bounds and approximations for production lines (Q1042029) (← links)
- Optimizing flow rates in a queueing network with side constraints (Q1266636) (← links)
- Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines (Q1268222) (← links)
- Modeling and analysis of machine sharing in manufacturing systems (Q1278184) (← links)
- Capacity planning in manufacturing and computer networks (Q1278227) (← links)
- An analytic formula for the mean throughput of \(K\)-station production lines with no intermediate buffers (Q1278238) (← links)
- An exploration of models that minimize leadtime through batching of arrived orders (Q1278395) (← links)
- The impact of preventive maintenance on system cost and buffer size (Q1278419) (← links)
- Models for multi-echelon repairable item inventory systems with limited repair capacity (Q1278648) (← links)
- Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system (Q1296001) (← links)
- Analysis of expected queueing delays for decision making in production planning (Q1303558) (← links)
- Concavity of system throughput and information transfer in a PAC system (Q1319681) (← links)
- A review of optimisation models of Kanban-based production systems (Q1333506) (← links)
- An analytical formula for variance of output from a series-parallel production system with no interstation buffers and time-dependent failures (Q1388962) (← links)
- Performance bounds for the effectiveness of pooling in multi-processing systems (Q1390293) (← links)
- Approximations for Markovian multi-class queues with preemptive priorities. (Q1426732) (← links)
- Operational capacity allocation for unreliable module-based assembly systems. (Q1428053) (← links)
- Expected time in system analysis of a single-machine multi-item processing center. (Q1429930) (← links)
- Optimal internal pricing and capacity planning for service facility with finite buffer (Q1592750) (← links)
- Setting optimal planned leadtimes in configure-to-order assembly systems (Q1622813) (← links)
- A comparison of Monte Carlo tree search and rolling horizon optimization for large-scale dynamic resource allocation problems (Q1694949) (← links)
- Dynamic facility layout problem based on open queuing network theory (Q1751845) (← links)
- Optimal control of a continuous-time \(W\)-configuration assemble-to-order system (Q1754268) (← links)
- An adaptive tabu search approach for buffer allocation problem in unreliable non-homogenous production lines (Q1762138) (← links)
- Analysis of assembly systems controlled with kanbans (Q1780740) (← links)
- Enterprise resource planning: Developments and directions for operations management research (Q1869550) (← links)
- A push-pull queueing system (Q1870012) (← links)
- Performance analysis and buffer allocations in some open assembly systems. (Q1870823) (← links)
- The effect of foreknowledge of demand in case of a restricted capacity: the single-stage, single-product case (Q1876162) (← links)
- Parallel simulation of transfer lines by time segmentation (Q1876199) (← links)
- The performance evaluation of a multi-stage JIT production system with stochastic demand and production capacities (Q2275812) (← links)
- Packing items to feed assembly lines (Q2384618) (← links)