Single and multiple period layout models for automated manufacturing systems (Q1175306): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: An exact branch-and-bound procedure for the quadratic-assignment problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Benders' partitioning scheme applied to a new formulation of the quadratic assignment problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Time-slot assignment for TDMA-systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic for quadratic Boolean programs with applications to quadratic assignment problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Numerical investigations on quadratic assignment problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: DISCON: A New Method for the Layout Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal and Suboptimal Algorithms for the Quadratic Assignment Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic algorithm for the quadratic assignment formulation to the plant layout problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3806522 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An exact algorithm for the general quadratic assignment problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3855869 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The plant layout problem in automated manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single and multiple period layout models for automated manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: The facility layout problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Quadratic Assignment Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Efficient Equipment-Layout Algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Dynamics of Plant Layout / rank
 
Normal rank
Property / cites work
 
Property / cites work: P-Complete Approximation Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Improved Long-Run Model for Multiple Warehouse Location / rank
 
Normal rank

Latest revision as of 09:45, 15 May 2024

scientific article
Language Label Description Also known as
English
Single and multiple period layout models for automated manufacturing systems
scientific article

    Statements

    Single and multiple period layout models for automated manufacturing systems (English)
    0 references
    0 references
    0 references
    25 June 1992
    0 references
    The paper studies making layout decisions for automated manufacturing systems for the uncertain product mix situation which is normally the case during the layout design phase. A single period model is first considered to find out the results of the product mix changes on the layout. A solution method is described which is based on solving a special version of a quadratic assignment problem as well as on an introduced concept of layout dominance. That model, while of interest itself, is then taken as a basis for a multi-period model where the product mix changes from one period to another are assumed. A dynamic programming formulation is developed to handle the later model.
    0 references
    layout decisions
    0 references
    automated manufacturing
    0 references
    quadratic assignment
    0 references
    layout dominance
    0 references

    Identifiers