Performance of scheduling algorithms for no-wait flowshops with parallel machines (Q1310022): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: On pedigree polytopes and Hamiltonian cycles / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Application of Bin-Packing to Multiprocessor Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tighter Bounds for the Multifit Processor Scheduling Algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: Evaluation of a MULTIFIT-based scheduling algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop and Jobshop Schedules: Complexity and Approximation / rank
 
Normal rank
Property / cites work
 
Property / cites work: No-wait shop scheduling: Computational complexity and approximate algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bounds for Certain Multiprocessing Anomalies / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bounds on Multiprocessing Timing Anomalies / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3940839 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3221735 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3313598 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3670909 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4051864 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some no-wait shops scheduling problems: Complexity aspect / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling algorithms for flexible flowshops: Worst and average case performance / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Adaptable Scheduling Algorithm for Flexible Flow Lines / rank
 
Normal rank

Latest revision as of 11:07, 22 May 2024

scientific article
Language Label Description Also known as
English
Performance of scheduling algorithms for no-wait flowshops with parallel machines
scientific article

    Statements

    Performance of scheduling algorithms for no-wait flowshops with parallel machines (English)
    0 references
    3 January 1995
    0 references
    The paper deals with particular cases of a no-wait flowshop problem with parallel machines. The general problem consists in scheduling a set of jobs \(\{1,\dots,n\}\) when processing of the \(i\)th job requires time \(p(i,j)\) at each machine center \(j\), \(1\leq j\leq k\) of the flowshop. Machine center \(j\) of the flowshop has \(m(j)\geq 1\) parallel machines. There is considered that each job has to be processed sequentially starting with cetner 1 and ending at the \(k\)th center. The job must be processed continuously from the beginning of its processing without any interruption on machines and without any waiting between the centers. The object is to find the minimum finish time schedule. The author presents worst case analyses of two heuristics for a flowshop problem with two centers when \(m(1)=1\) and \(m(2)>1\) and proves that the found upper bounds of the ratio \(f/f^*\) are the best possible. (The values \(f\) and \(f^*\) are objective function values of a feasible and optimal schedule respectively.) Similarly, worst case analyses of two another heuristics solving a flowshop problem with two centers for the case when \(m(1)= m(2)>1\) were done and their upper bounds \(f/f^*\) were found. The last part of the paper comprises a description and worst case performance analysis of a heuristic algorithm for a two center flowshop problem with \(m(1)>1\) and \(m(2)>1\).
    0 references
    no-wait flowshop
    0 references
    parallel machines
    0 references
    minimum finish time schedule
    0 references
    worst case analyses
    0 references
    heuristics
    0 references
    two center flowshop
    0 references

    Identifiers