A genetic algorithm for the resource constrained multi-project scheduling problem (Q2482793): Difference between revisions

From MaRDI portal
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
(3 intermediate revisions by 3 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2006.06.074 / rank
Normal rank
 
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2006.06.074 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2070975460 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Genetic Algorithms and Random Keys for Sequencing and Optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling subject to resource constraints: Classification and complexity / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid genetic algorithm for the weight setting problem in OSPF/IS‐IS routing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A decomposition approach to multi-project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling of Project Networks by Job Assignment / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for the weight setting problem in OSPF routing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4692508 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid genetic algorithm for the job shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-Project Scheduling: Categorization of Heuristic Rules Performance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multicriteria heuristic method to improve resource allocation in multiproject scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Constrained multi-project planning problems: A Lagrangean decomposition approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization analysis for design and planning of multi-project programs / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2006.06.074 / rank
 
Normal rank

Latest revision as of 22:23, 18 December 2024

scientific article
Language Label Description Also known as
English
A genetic algorithm for the resource constrained multi-project scheduling problem
scientific article

    Statements

    A genetic algorithm for the resource constrained multi-project scheduling problem (English)
    0 references
    24 April 2008
    0 references
    project management
    0 references
    metaheuristics
    0 references
    genetic algorithm
    0 references
    scheduling
    0 references

    Identifiers