An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055): Difference between revisions

From MaRDI portal
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2011.07.010 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2037993354 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling: Notation, classification, models, and methods / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu search in audit scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling under limited resources. Models, methods, and applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling subject to resource constraints: Classification and complexity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4149194 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An investigation into the relationship of heuristic performance with network-resource characteristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling of Project Networks by Job Assignment / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4248938 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A robust genetic algorithm for resource allocation in project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A self-adapting genetic algorithm for project scheduling under resource constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simulated annealing algorithm for resource constrained project scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling with time-varying resource constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Insertion techniques for static and dynamic resource-constrained project scheduling. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An iterative scheduling technique for resource-constrained project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: PSPLIB -- a project scheduling problem library / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4451582 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A random key based genetic algorithm for the resource constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid scatter search/electromagnetism meta-heuristic for project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid genetic algorithm for the resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q2776575 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Case-based reasoning and improved adaptive search for project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Adaptive search for solving hard project scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A neurogenetic approach for the resource-constrained project scheduling problem / rank
 
Normal rank

Latest revision as of 21:06, 5 July 2024

scientific article
Language Label Description Also known as
English
An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
scientific article

    Statements

    An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (English)
    0 references
    0 references
    0 references
    15 November 2012
    0 references
    resource-constrained project scheduling
    0 references
    shuffled frog-leaping algorithm
    0 references
    resource-based crossover
    0 references
    combined local search
    0 references
    speed-up evaluation
    0 references
    design-of-experiment
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers