A disruption recovery plan in a three-stage production-inventory system (Q337485): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2014.12.003 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2074382970 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The effect of capital lockup and customer trade credits on the optimal lot size -- a confirmation of the EPQ. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A dynamic analysis of the single-item periodic stochastic inventory system with order capacity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust planning in optimization for production system subject to random machine breakdown and failure in rework / rank
 
Normal rank
Property / cites work
 
Property / cites work: Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3826327 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Recovering Cyclic Schedules Using Dynamic Produce-Up-To Policies / rank
 
Normal rank
Property / cites work
 
Property / cites work: Determination of Optimum Production Quantity for a Two-Stage Production System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-stage production-inventory systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A disruption recovery model for a single stage production-inventory system / rank
 
Normal rank
Property / cites work
 
Property / cites work: A dynamic programming approach for batch sizing in a multi-stage production process with random yields / rank
 
Normal rank
Property / cites work
 
Property / cites work: On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Supply interruptions in a lost-sales inventory system with random lead time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis of a Production/Inventory System Subject to Random Disruptions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Development of a production inventory model with uncertainty and reliability considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Real time disruption management for a two-stage batch production-inventory system with reliability considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: An EPQ model with inflation in an imperfect production system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal batch sizing in a multi-stage production system with rework consideration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Disruption management in production planning / rank
 
Normal rank
Property / cites work
 
Property / cites work: An economic production quantity model with flexibility and reliability considerations / rank
 
Normal rank

Latest revision as of 22:53, 12 July 2024

scientific article
Language Label Description Also known as
English
A disruption recovery plan in a three-stage production-inventory system
scientific article

    Statements

    A disruption recovery plan in a three-stage production-inventory system (English)
    0 references
    0 references
    0 references
    0 references
    10 November 2016
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    production-inventory system
    0 references
    disruption recovery
    0 references
    mixed-production environment
    0 references
    heuristic
    0 references
    pattern search
    0 references
    0 references
    0 references