A multicriteria heuristic method to improve resource allocation in multiproject scheduling (Q1590045): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
 
(One intermediate revision by one other user not shown)
Property / cites work
 
Property / cites work: Some efficient multi-heuristic procedures for resource-constrained project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-Project Scheduling: Categorization of Heuristic Rules Performance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: An iterative scheduling technique for resource-constrained project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling. Exact methods for the multi-mode case / rank
 
Normal rank
Property / cites work
 
Property / cites work: Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization analysis for design and planning of multi-project programs / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/s0377-2217(99)00490-7 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2093819688 / rank
 
Normal rank

Latest revision as of 10:31, 30 July 2024

scientific article
Language Label Description Also known as
English
A multicriteria heuristic method to improve resource allocation in multiproject scheduling
scientific article

    Statements

    A multicriteria heuristic method to improve resource allocation in multiproject scheduling (English)
    0 references
    0 references
    0 references
    0 references
    19 August 2002
    0 references
    project management
    0 references
    project management software
    0 references
    multicriteria heuristic algorithm
    0 references

    Identifiers