Pages that link to "Item:Q1590045"
From MaRDI portal
The following pages link to A multicriteria heuristic method to improve resource allocation in multiproject scheduling (Q1590045):
Displaying 19 items.
- Resource allocation in multi-class dynamic PERT networks with finite capacity (Q320114) (← links)
- Resource allocation in dynamic PERT networks with finite capacity (Q420887) (← links)
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling (Q421082) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (Q1014947) (← links)
- Hybrid genetic algorithm with multiparents crossover for job shop scheduling problems (Q1665003) (← links)
- A learning-based optimization approach to multi-project scheduling (Q2018943) (← links)
- Managing and modelling general resource transfers in (multi-)project scheduling (Q2379662) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem (Q2482379) (← links)
- A genetic algorithm for the resource constrained multi-project scheduling problem (Q2482793) (← links)
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem (Q2629594) (← links)
- An efficient multi-pass heuristic for project scheduling with constrained resources (Q4460052) (← links)
- Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms (Q5143361) (← links)
- A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem (Q5438568) (← links)
- A note on the paper ''Resource-constraint project scheduling: Notation, classification, models and methods'' by Bruckner et al (Q5925873) (← links)
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates (Q6112409) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)