Decomposed vs. integrated control of a one-stage production system (Q1600940): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
 
(One intermediate revision by one other user not shown)
Property / cites work
 
Property / cites work: The capacity aspect of inventories / rank
 
Normal rank
Property / cites work
 
Property / cites work: Expected Waiting Time for Nonsymmetric Cyclic Queueing Systems—Exact Results and Applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3996922 / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/s0377-2217(01)00146-1 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2131890934 / rank
 
Normal rank

Latest revision as of 10:00, 30 July 2024

scientific article
Language Label Description Also known as
English
Decomposed vs. integrated control of a one-stage production system
scientific article

    Statements

    Decomposed vs. integrated control of a one-stage production system (English)
    0 references
    0 references
    0 references
    0 references
    16 June 2002
    0 references
    0 references
    decomposed control
    0 references
    integrated control
    0 references
    simulation
    0 references
    0 references